How to handle design changes mid-fabrication
Mid-fabrication changes need a hold on the affected cutlists, a disposition on what is already cut, and an update to the same product record — not a second Excel BOM. Spectr expects design change as normal and keeps the virtual twin as the thing you revise.
Key facts
- Already-cut material is a decision: rework, scrap, or reassign.
- The shop will finish what is on the table unless the board says stop.
- A crate may already hold the old mark — labels and status have to catch it.
- Generic ECO workflows are too slow for a two-inch move the architect already verbalized.
How shops handle this
- Stop the affected cutlists
Make the hold visible on the shop queue. - Update the issued record
Same IDs where the mark still exists. - Disposition WIP in inventory
Do not let a bad panel ride into a crate. - Tell shipping and field the same hour
One system, not a new text thread.
Common questions
Who approves the remake cost?
A human. The system’s job is to make the quantity and the timing undeniable.
Should we have waited to cut?
Sometimes. Phased issue is how you cut only what is stable.