← All answers
Design, CAD & BOMs
How to stop rebuilding BOMs in Excel
Rebuilding a BOM in Excel after CAD approval is a second design process — slower, and usually wrong in one cell. Spectr generates the BOM from the design file so engineering, purchasing, and the shop share one product list.
Key facts
- The Excel BOM is almost never the same revision as the PDF on the wall.
- Purchasing from a typed list is how you order the wrong color or the wrong core.
- Spectr’s design flow is built to kill that retype step.
- Once products exist, inventory allocation and cutlists hang off the same records.
How shops handle this
- Ban “just this job” takeoffs
One exception becomes the process. - Generate from CAD in Spectr
Issue products the shop can scan. - Make Excel an export, not a source
Analysts can still pivot. The floor cannot. - Measure rework that started as a typo
That number is your business case.
Common questions
Our estimator still needs Excel.
Estimating can stay there. Awarded, approved drawings should not go back into a blank workbook.
What if CAD is messy?
Fix the issued drawing once. Do not launder a messy model through a messier sheet.
Related answers
Experience how Spectr could fit in your shop
From the jobs you're quoting now to the installs you're managing next month — we'll walk through your actual work, not a canned tour.
Start a conversation