← All answers
Projects, submittals & schedules

How to break a facade job into phases

A facade job is a building with shifting site dates. Spectr uses phases, scopes, and directives so production and shipping can follow an elevation instead of one undifferentiated work order.

Key facts

  • Work-order thinking hides elevation sequence.
  • Spectr’s public plan page is built around project phasing and dashboards for facade work.
  • A phase date change should move the shop list, not only a Gantt bar.
  • Issue BOMs in phases you are actually allowed to build.

How shops handle this

  1. Name phases the way the site talks
    West podium, level 8–12 — not “Phase 1” if nobody uses that.
  2. Attach products to a phase
    Or the crate map will pack whatever finished first.
  3. Give each phase a site window
    Then schedule cutlists and finish backward from that date.
  4. Re-sequence when the GC slips
    The shop should see the new priority the same day.

Common questions

Is a phase the same as a Procore area?

It can map. Your phase still has to own products, crates, and shop priority.

How many phases?

Enough that a date change is usable. Not so many that engineering lives in the ERP.

Related answers

Experience how Spectr could fit in your shop

From the jobs you're quoting now to the installs you're managing next month — we'll walk through your actual work, not a canned tour.

Start a conversation