How to break a facade job into phases
A facade job is a building with shifting site dates. Spectr uses phases, scopes, and directives so production and shipping can follow an elevation instead of one undifferentiated work order.
Key facts
- Work-order thinking hides elevation sequence.
- Spectr’s public plan page is built around project phasing and dashboards for facade work.
- A phase date change should move the shop list, not only a Gantt bar.
- Issue BOMs in phases you are actually allowed to build.
How shops handle this
- Name phases the way the site talks
West podium, level 8–12 — not “Phase 1” if nobody uses that. - Attach products to a phase
Or the crate map will pack whatever finished first. - Give each phase a site window
Then schedule cutlists and finish backward from that date. - Re-sequence when the GC slips
The shop should see the new priority the same day.
Common questions
Is a phase the same as a Procore area?
It can map. Your phase still has to own products, crates, and shop priority.
How many phases?
Enough that a date change is usable. Not so many that engineering lives in the ERP.