Introduction
If you’ve just finished reading What is an ERP?, you might be thinking: "We've always done it this way. My spreadsheets work fine. My software solutions have been reliable for years."
And maybe they do. But here's an interesting question: How would you know if they didn't?
You've probably had this experience: You're reviewing a project, and something doesn't add up. Maybe the material costs seem off, or the schedule doesn't match what production reported. So you dig into the spreadsheets or one of the disconnected software tools to investigate.
Three hours later, you've found the problem: someone copied the wrong cell, or referenced an old version of a file when inputting those values in one of the software tools. It happens.
But here's the real question: How many times does it happen without anyone noticing?
The Uncomfortable Truth
Research from the University of Hawaii studied thousands of business spreadsheets and found that 94% contain errors. Not cosmetic issues, just errors in the calculations that drive your decisions.
And here's the really uncomfortable part: even when people actively look for errors, they only find about 60% of them.
Professor Raymond Panko at the University of Hawaii has spent decades studying spreadsheet errors. His research isn't based on a handful of examples, rather 85 intensive audits of business spreadsheets and laboratory studies involving nearly 1,000 participants.
The findings are consistent and uncomfortable:
94% of spreadsheets contain errors. Not minor formatting issues, but wrong formulas, incorrect cell references, or omitted calculations overall. Errors that affect the bottom line.
Even small errors compound rapidly. The research shows that spreadsheets have an average cell error rate of about 4%. That sounds small. But when you have chains of calculations, where one cell feeds into another, which feeds into another...the probability of at least one error affecting your final number approaches certainty.
Detection rates are shockingly low. When people actively look for errors in spreadsheets, they catch about 60% of them on average. The most difficult errors, however, like omitted steps or logic mistakes, have detection rates below 10%.
This isn't because people are careless. It's because humans make errors at a baseline rate of 3-4% even under ideal conditions. We're fast and flexible, but not always precise. And a combination of spreadsheets or disconnected tools give us more and more places to make those errors.
How Errors Cascade Through Manufacturing
Let's trace what happens when a small error enters your system and moves through your operation.
Sales and Estimating
Your estimator is pricing fasteners for an 80-panel facade project. They pull up the supplier spreadsheet: $0.05 per fastener. The actual price is $0.50. A simple decimal error.
The spreadsheet calculates 80 panels × 150 fasteners per panel × $0.05 = $600 for fasteners. Should be $6,000.
The total project estimate is $280,000. The quote looks reasonable. You win the bid. Three months later, when the project closes out, you realize the job made half the profit you expected.
Cost: $5,400 in margin erosion on one line item.
Production Planning
Your estimator is quoting a large facade project. They open the material cost reference spreadsheet to price aluminum extrusions. The cell shows $7.50/kg; accurate when the spreadsheet was created in 2024.
It's now 2025. Aluminum is $8.09/kg. That's an 8% increase, but the spreadsheet still shows the old price. No one updated it.
On a project requiring 5,000 kg of aluminum, you've underestimated material costs by $2,950. The quote looks competitive. You win the bid. When the actual invoices come in months later, your margin has evaporated.
Cost: $2,950 in margin erosion, multiplied across every material that's gone up since the spreadsheet was last updated.
Inventory and Purchasing
Production needs 500 linear feet of a specialty gasket material. The inventory spreadsheet shows 600 feet in stock.
What it doesn't show: 400 of those feet are already allocated to another project that's starting next week. The gasket has a 4-week lead time.
You don't order more because the spreadsheet says you're covered. Two weeks later, production stops when they run out.
Cost: 4 days of production downtime while you expedite material.
The Shop Floor
The fabrication team pulls up the production specs. Panel thickness: 0.125". They cut and fabricate 30 panels.
The architect issued a revision three days ago changing it to 0.1875". The revision made it into the project management tool, but the production spreadsheet wasn't updated.
You discover the error during a quality inspection. All 30 panels need to be scrapped and remade.
Cost: $18,000 in material and labor, plus a week of schedule slip.
Shipping and Installation
The packing list shows 44 panels for the Chicago site. The installation crew is on-site, crane rental paid for the day ($2,800), ready to install 44 panels.
They unload the truck. There are 41 panels. Three were recorded in a different job's spreadsheet and shipped to a warehouse in Milwaukee yesterday.
The crew can't complete the installation. The crane gets sent home. You overnight the missing panels.
Cost: $2,800 wasted crane rental + $1,200 expedited shipping + rescheduling fee.
When Software Makes It Worse
You probably recognized some of these spreadsheet problems. Maybe that's why you invested in project management software. Or time tracking tools. Or estimating software. That was the right instinct.
But here's what actually happened: Now you're not just managing spreadsheet errors. You're also managing the handoffs between systems.
Someone exports data from the estimating tool, manually enters it into the project management system, then copies it into a spreadsheet for the production schedule. They download time tracking data to update job costs. They pull inventory numbers from one system to check against purchase orders in another.
Every handoff is another opportunity for error.
The Hawaii research showed that manual data entry has a 3-4% error rate under ideal conditions. Now you're doing that manual entry multiple times, between multiple systems, under actual working conditions: rushed, distracted, multitasking.
And worse: Now you have multiple "versions of the truth."
You didn't just keep the spreadsheet problem. You multiplied it.
The Real Cost
The cost isn't just the time spent fixing errors. It's:
The projects that lose money because the estimate was off and no one caught it until the job was finished.
The production delays because materials didn't arrive on time due to an inventory tracking mistake.
The rush fees and expedited shipping to fix problems that could have been caught earlier.
The rework because specifications were wrong or components were built to outdated dimensions.
The customer relationship is damaged when deliveries are wrong or installation gets delayed.
The hours every week spent reconciling numbers, chasing down discrepancies, and figuring out which version of which file has the right information.
Most manufacturers don't add this up because it's spread across dozens of small incidents. A little overstock here. A small scheduling slip there. An estimate that came in too low but not catastrophically so.
But it adds up. And more importantly, it's preventable.
Why This Keeps Happening
This isn't about being bad at spreadsheets or choosing the wrong software tools. The problem is structural.
Spreadsheets and disconnected tools create an environment where:
- Information lives in multiple places
- Manual handoffs are required
- Errors can hide for weeks or months
- No one has full visibility across the operation
- Every day brings more opportunities for things to drift out of sync
You can hire smarter people, add more checks, and create better procedures. But you're fighting human error rates that have been consistent across every industry for decades.
The answer isn't trying harder. It's removing the conditions that cause errors in the first place.
What's Next?
If you're in facade fabrication, these problems are even more acute. Every project is different. Architects might modify designs mid-production. Installation schedules depend on weather and site conditions. You're managing complexity and conditions that repetitive manufacturing never deals with.
Want to see how these challenges play out specifically in facade fabrication?
Read: Why Facade Fabrication is Different from Manufacturing →