← All answers
Shipping, crates & finishing
How to schedule finishing without delaying install
Schedule finishing from the install phase date backward: vendor capacity, transit, and a buffer for rejects. Spectr puts the services calendar on the same timeline as production and shipping so a late rack is visible before the crew is standing around.
Key facts
- Install dates move. Finish dates have to move with them or you will air-freight painted metal.
- Rejects at the coater are a scheduled risk, not a surprise.
- Do not crate for site before finish is actually back and received.
- The shipping dashboard should not show “ready” if the rack is still at the anodizer.
How shops handle this
- Set the phase date first
Site need is the constraint. - Book the vendor in the services calendar
Date, project, provider. - Release fabrication that can finish in time
Do not flood the coater and hope. - Re-plan when the GC slips — or when they pull left
Both directions break a static Excel Gantt.
Common questions
The coater will not live in our software.
They do not have to. You still need the task and the contents on your side.
Can we stock finished extrusions?
Only if the system and the spec allow it. Most architectural finishes are job-specific.
Related answers
Experience how Spectr could fit in your shop
From the jobs you're quoting now to the installs you're managing next month — we'll walk through your actual work, not a canned tour.
Start a conversation