How to survive being the last trade on site
Last trade means the completion date rarely moves when steel or concrete does. Spectr’s phase dates, shop queues, and services calendar exist so a compressed window can re-sequence cutlists and crates — instead of discovering the conflict when the crew is standing around.
Key facts
- Schedule compression lands on the envelope.
- A static Excel Gantt cannot absorb a pull-left or a slip.
- Finish vendors have to move with the site date.
- Rushed work increases error risk — the system should show the cost to the other job.
How shops handle this
- Treat the phase date as the constraint
Everything else is a dependent. - Re-plan the queue the same day
CNC and crate line, not a Friday meeting. - Protect issued revisions
Compression is not an excuse to cut last week’s PDF. - Give the field crate truth
They will not have time to call the shop.
Common questions
Can software fix a bad GC schedule?
No. It can stop your shop from working the wrong elevation while you argue.
Should we just add overtime?
Sometimes. The system should make that a visible choice, not a surprise.